The overall objectives of the consultancy are to :

Lot 1_ Buccament - Provide an updated assessment of theΒ  hydrological / hydraulic conditions in the Vermont – Buccament catchment area and to develop a design for remedial works to ensure that the resulting system will provide long-term protection of public infrastructure from flooding and damage from the Buccament River;

Lot 2_ Carriere/Ford - Using existing hydrologic studies, provide an embankment design for the Ford river at Carriere;

Provide construction supervision support to the Ministry of Economic Planning, Sustainable Development, Industry, Information and Labour (MoESIIL)during the implementation and construction of the approved interventions.

Closing Date
Expiration Date
Procurement Term