The overall objectives of the consultancy are to :
Lot 1_ Buccament - Provide an updated assessment of theΒ hydrological / hydraulic conditions in the Vermont β Buccament catchment area and to develop a design for remedial works to ensure that the resulting system will provide long-term protection of public infrastructure from flooding and damage from the Buccament River;
Lot 2_ Carriere/Ford - Using existing hydrologic studies, provide an embankment design for the Ford river at Carriere;
Provide construction supervision support to the Ministry of Economic Planning, Sustainable Development, Industry, Information and Labour (MoESIIL)during the implementation and construction of the approved interventions.